
Studio · July 2026
Inside Our HITEC City Material Library
The library is a room at the back of the studio on Level 4. Samples stay out. Clients sit with them, not with a slide.
We group materials by how they age, not by supplier. Oak next to lime plaster. Travertine next to unlacquered metal. If a finish only looks right when it is new, it does not stay.
The table changes through a project. By the end, the palette for a house can be held in two hands.